PRODUCT SUMMARY:

International Construction Consortium (Pvt) Ltd is the leading of manufacturer of precast concrete Up Right and associated precast products in Sri Lanka. They are available in accordance with the RDA standards and other standard specifications also.

The Up Right are manufactured with high quality controlling and quality assurance systems under engineer supervision.

GENERAL SPECIFICATIONS:

  • Details Specification – RDA Standard And Project Standard
  • Raw Material Specification – BS / ASTM / SLS Standard
  • Concrete Strength : 30kn/mm2
  • Curing Period (Min.) : 7 Days
  • Stacking & Packing : wooden Pallet (1200mm x1200mm)
  • Quantity for a wooden Pallet: 21 Nos.

CLIENT RESPONSIBILITIES

  • Selection of correct & required Items prior to purchase.
  • Check & get the confirmation of available stock availability before the purchase.
  • Vehicle access path should be clear.
  • Unloading should be arranged by the client.
  • If the transportation is arranged by client, vehicles should be suitable.
  • Pallet quantity for a 6 Wheel 20 feet long flatbed Vehicle: 08 Nos.
  • Pallet quantity for a 10 Wheel 23 feet long flatbed Vehicle: 10 Nos.
  • Do not stay in hazardous areas while unloading.

 

COMPLETED PROJECTS:

PROJECT NAME 

QUANTITY

NOS.

Thirappane-Galkulama 5 Nos. Bridgers (A9 Road)210
Southern Expressway project – Section 02/03180
Badulla-Passara Road Bridgers Construction work204
25 Bride Construction Project350
Pokunuwita-Pamankada Road Construction Project ( 120 Road)2800
Habarana – Kanthale-Thonigala Road Construction Project250
Oyamaduwa Bridges Construction Project1260
Outer Circular Highway Construction Project126
Bolgoda Bridge Construction project212
Galewela Bridge Construction Project (A6 Road)88

 

 

TERMS OF SALE:

  • This price has been worked out as per the current prices of the basic material (Cement, R/F, and steel formwork) and any escalation of the basic material price to paid on actual basis.
  • The order could be confirmed by making an advance payment amounting to 75% of the total sum and the balance is to be paid before collection.
  • Return not accepted.
  • Price validity time is vary.
  • If registered, should be send the VAT/SVAT registration letter

Compare listings

Compare