ICC Precast Bridge Kerb 915x280x280mm

Lead Time Days14
Unit Of MeasureNos.
Weight (kg)86.000000
Country of ManufactureSri Lanka
Country of OriginSri Lanka
BrandICC
Primary MaterialConcrete
ColourNatural Cement Gray
Warranty PeriodN/A

PRODUCT SUMMARY:

International Construction Consortium (Pvt) Ltd is the leading manufacturer of precast concrete kerbs and
associated precast products in Sri Lanka. They are available in accordance with the RDA standards and other standard
specifications also.
The kerbs are manufactured with high-quality control and quality assurance systems under engineer supervision.

The Bridge kerb are used for the location of both sides of the bridge center Island. (Please refer to the general kerb data sheet)

GENERAL SPECIFICATIONS:

  • Details Specification – RDA Standard And Project Standard
  • Raw Material Specification – BS / ASTM / SLS Standard
  • Concrete Strength : 30kn/mm2
  • Curing Period (Min.) : 7 Days
  • Stacking & Packing : wooden Pallet (1200mm X1200mm)
  • Quantity for a wooden Pallet: 9 Nos.

CLIENT RESPONSIBILITIES

  • Selection of correct & required Items prior to purchase.
  • Check & get the confirmation of available stock availability before the purchase.
  • Vehicle access path should be clear.
  • Unloading should be arranged by the client.
  • If the transportation is arranged by client, vehicles should be suitable.
  • Pallet quantity for a 6 Wheel 20 feet long flatbed Vehicle: 08 Nos.
  • Pallet quantity for a 10 Wheel 23 feet long flatbed Vehicle: 10 Nos.
  • Do not stay in hazardous areas while unloading.

 

COMPLETED PROJECTS:

 

 

PROJECT NAME 

QUONTITY

NOS.

Thirappane-Galkulama 5 Nos. Bridgers (A9 Road)380
Southern Expressway project – Section 02/03356
Badulla-Passara Road Bridgers Construction work634
25 Bride Construction Project660
Pokunuwita-Pamankada Road Construction Project ( 120 Road)2800
Habarana – Kanthale-Thonigala Road Construction Project890
Oyamaduwa Bridges Construction Project1260
Outer Circular Highway Construction Project566
Bolgoda Bridge Construction project352
Galewela Bridge Construction Project (A6 Road)256

TERMS OF SALE:

  • This price has been worked out as per the current prices of the basic material (Cement, R/F, and steel formwork) and any escalation of the basic material price to paid on an actual basis.
  • The order could be confirmed by making an advance payment amounting to 75% of the total sum, and the balance is to be paid before collection.
  • Return not accepted.
  • Price validity time varies.
  • If registered, should be send the VAT/SVAT registration letter.

Bridge Kerbs are most probably used for bridge construction work. The kerbs are always fixed between the road and the bridge pedestrian path.

Compare listings

Compare