ICC Precast Bridge Beams

Lead Time Days0
Unit Of MeasureNos.
Weight (kg)2300.000000
Height225
Width610
Length7010
Country of ManufactureSri Lanka
Country of OriginSri Lanka
BrandICC
Primary MaterialConcrete
ColourGray
Warranty PeriodN/A

PRODUCT SUMMARY:

International Construction Consortium (Pvt) Ltd is the leading manufacturer of precast concrete PSC Bridge Beams and other associated precast products in Sri Lanka. They are available in accordance with the RDA standards and other standard specifications. The PSC Bridge Beams are most often used for road construction networks and flyover platforms. The Bridge girder is manufactured with high-quality control and quality assurance systems under the engineer’s supervision.

GENERAL SPECIFICATIONS:

PRICE TABLE (Excluding VAT)
Length-mmWide-mmHeight-mmDrawing No.Weight-kgPrice (Rs.)
7010610225T/B/0302300  125,000.00
9500500380T/B/5072320130,000.00
11500500450T/B/5063210164,000.00
13500500525T/B/5054200200,000.00
14500500600T/B/503 A4710250,000.00
15500500650T/B/502 A5440285,000.00
16500500700T/B/501 A6160305,000.00
17500500700T/B/5156880325,000.00
19000500825T/B/508 Rev 18120390,000.00

KEY DETAILS
Concrete Strength45kN/mm2
Curing Period (Min.)14 Days
TransportationNeed specialized vehicle
Raw Material StandardsBS / ASTM / SLS
StandardsRDA Standard And Project Standard
***Please refer to the attached product data sheet for more details***

CLIENT RESPONSIBILITIES

  • Selection of correct & required Items before purchase.
  • Check & get the confirmation of stock availability before the purchase.
  • The vehicle access path should be clear.
  • Unloading should be arranged by the client and it should via by suitable crane.
  • If the transportation is arranged by client, vehicles should be suitable.
  • Do not stay in hazardous areas while unloading.

COMPLETED PROJECTS:

Project/ClientLength-mQuantity
Nos
Year
Maggana Bridge15.5802023
Maoya- Bridge (HUnan Contruction)19.00382020
Manning Market Project at Peliyagoda12.87602020
Manning Market Project at Peliyagoda13.42602020
Manning Market Project at Peliyagoda17.44562020
Werasganga Project at Raththanapitiya-UDA4.6712019
Werasganga Project at Raththanapitiya-UDA4.32482019
Navakiri Bridge at Ampara11.5602018
Major Bridge Construction Project at Cheddikulam19.003082017
Kudawella Fishery Harbour9.51002017

 

TERMS OF SALE:

  • Product stock is not available, and manufacturing will be done only as per the customer’s requirement.
  • This price has been worked out as per the current prices of the basic material (Cement, R/F, and steel form work), and any escalation of the basic material price is to be paid on an actual basis.
  • The order could be confirmed by making an advance payment amounting to 75% of the total sum and the balance is to be paid before collection.
  • Returns are not accepted.
  • Price validity time varies.
  • If VAT registered, the customer should send the VAT/SVAT registration letter
  • View the ICC PRECAST TERMS OF SALE

PRICE EXCLUDING VAT

Length
mm
Wide
mm
Height
mm
Drawing No.Weight
kg
Price (Rs.)
7010610225T/B/0302300 125,000.00
9500500380T/B/5072320130,000.00
14500500600T/B/503 A4710250,000.00
19000500825T/B/508 Rev 18120390,000.00

Compare listings

Compare